Permit & NOC Tracker

Free permit and NOC tracker for construction projects. Log approvals, responsible parties and expiry dates, and follow requirements to closure.

Sample Project
Track permits, approvals and No Objection Certificates (NOCs) — issuing authority, responsible party and expiry dates flagged automatically — alongside a register of outstanding requirements tracked to closure.
by Shahid Pervaiz: pervaiz.shahid@gmail.com
Permits/NOCs0
Expiring/Expired0
Status Date—
Rev.A
Not saved to a file yet 📄 See Sample Report

Project Setup

Compliance Summary

Permit & NOC Register

No. column is editable · Status is calculated from Approval Status and Expiry Date (expiring within 30 days is flagged)
No. Permit / NOC Name Type Issuing Authority Responsible Party Application Date Approval Status Expiry Date Status Req. Ref Remarks Scan

Outstanding Requirements Register

Status is calculated automatically from target/completion dates
No. Req. Ref Linked Permit/NOC Requirement Description Responsible Person Target Date Completion Date Status Remarks
Method & practical use

Understand the result.

Free permit and NOC tracker for construction projects. Log approvals, responsible parties and expiry dates, and follow requirements to closure.

How to use this tool

  1. Enter the project details and reporting date; replace any sample records.
  2. Add or import your records, then review the summaries and outstanding actions.
  3. Save the project and use the available export or print controls to share the current report.

Units & method

Use the dates, quantities and currency shown in the workspace. Keep one currency and a consistent reporting cut-off.

Track authority, permit expiry, renewal and outstanding conditions. Date flags support follow-up and do not determine legal validity.

Method: the owner’s supplied worksheet and the arithmetic described above.

Worked examples

Illustrative inputs for checking the method; these are not project records.

Worked scenario

Example: a permit expiring on 30 October needs its renewal action recorded before that date; an unmet condition remains open until evidence is attached.

Frequently asked questions

What does this tool calculate or track?

Free permit and NOC tracker for construction projects. Log approvals, responsible parties and expiry dates, and follow requirements to closure.

Which units and assumptions should I use?

Use the dates, quantities and currency shown in the workspace. Keep one currency and a consistent reporting cut-off. Track authority, permit expiry, renewal and outstanding conditions. Date flags support follow-up and do not determine legal validity.

Can I save or share the result?

Use the save, export and print controls shown in this workspace. Where CSV export is available, the exported data can be opened in a spreadsheet. Browser print can save a PDF.

How to use the Permit & NOC Tracker

Everything runs in your browser — nothing is uploaded. If you are new to the tool, follow these steps in order.

1

See what the tool can do

Press Load Sample Data to fill the tracker with sample permits and outstanding requirements. Then scroll down the page:

  • Project Setup — project name, client, status date and who prepared it.
  • Compliance Summary — approved, pending, rejected and expiring permits and open requirements.
  • Permit & NOC Register — one row per permit or NOC.
  • Outstanding Requirements Register — what is still needed for each permit.

The first time you open the tool (when there is no data of yours in this browser) the sample is loaded for you, so you can see how it works straight away. Replace it with your own entries, press + New Project / Clear All to start empty, or load your saved project.

Load Sample Data replaces the data in the tool. Save your own work first.

2

See how the data file looks

Press ⬇ Export Permits (.csv). It downloads the permit register as a CSV file that opens in Excel, with these 10 columns in this order:

ColumnWhat to enterExample
NoRow number1
NamePermit or NOC nameRoad cutting NOC
TypeBuilding Permit, NOC (No Objection Certificate), Environmental Clearance, Fire Safety Approval, Municipality Approval, Utility Connection Permit, Import Permit or OtherOther
Issuing AuthorityAuthorityMunicipality
Responsible PartyContractor, Consultant, Client, Authority or OtherContractor
Application DateYYYY-MM-DD2026-06-01
Approval StatusNot Submitted, Submitted, Under Review, Approved or RejectedUnder Review
Expiry DateYYYY-MM-DD2027-06-01
Req RefLinked requirement referenceREQ-02
RemarksAny note

The second table has its own ⬇ Export Requirements (.csv) button, with these 8 columns:

ColumnWhat to enterExample
NoRow number1
Req RefYour referenceREQ-02
Linked Permit/NOCThe permit it belongs toFire Safety Approval
DescriptionWhat is still neededSubmit fire strategy report
Responsible PersonWho does itMEP Consultant
Target Date / Completion DateYYYY-MM-DD; completion blank while open2026-10-01
RemarksAny note
3

Enter your own data and import it

Replace the sample rows with your own permits and save it in excel as csv (comma delimited). Then press ⬆ Import Permits (.csv) and choose the file.

  • Columns are read by position, so keep the heading row and don't add, remove or reorder columns.
  • Enter dates as YYYY-MM-DD.
  • Import replaces all permits. The project setup is kept.
  • Import the outstanding requirements the same way with ⬆ Import Requirements (.csv).

Excel often changes dates to your local format when it opens a CSV. Before saving, set the date columns to the custom format yyyy-mm-dd, or those dates may be left blank on import.

4

Add, edit and delete rows

You can also work straight in the table on the page at any time, with or without a CSV:

  • + Add Permit / NOC and + Add Outstanding Requirement add a blank row to their table. Click any cell to change it.
  • The ✕ at the end of a row deletes it straight away. There is no undo, so save your project first.
5

Attach the scanned permit / NOC

Each row of the Permit & NOC Register has a Scan column for one scanned copy of the permit or NOC — a PDF (all its pages) or an image (JPG, PNG):

  • 📎 (faint) — no scan yet. Click it and choose the file.
  • 📄 (highlighted) — a scan is attached. Click it to see the document in a pop-up, where you can Replace, Remove or Download it.
  • Large photos and scanned images are reduced automatically to keep the project file small; a PDF must be under 5 MB.
  • The scan is kept in the project file when you press 💾 Save Project (.json), and comes back with 📂 Load Project. It is not uploaded anywhere.

Autosave in this browser keeps the permit details but not the scans (the browser has too little room). Use Save Project to keep the scans.

6

Save your project and open it later

💾 Save Project (.json) saves the project setup, all permits with their attached scans and all requirements in one .json project file. 📂 Load Project opens that file again, on any computer.

The note beside the Save button tells you whether you have unsaved changes or when you last saved. If you try to close or leave the page with unsaved changes, the browser asks you to confirm first (not needed when Autosave is ticked, because your work is kept in this browser).

Use the project file for backups and for sharing with colleagues. Don't edit it by hand.

7

Print, PDF and report

  • 🖶 Print / Save as PDF prints the page as you see it, in print-friendly colours. To get a PDF, choose Save as PDF as the printer in the print dialog.
  • 📄 Generate Report opens a formatted permit and NOC report in a new tab, with its own Print / Save as PDF button. If nothing opens, allow pop-ups for this site. To see a report the tool makes from its sample project (5 pages, PDF), press 📄 See Sample Report beside How to use.
8

Other buttons and options

  • Autosave in this browser (tick box) — while ticked, your work is kept automatically in this browser and comes back the next time you open the page. It stays only on this computer and browser. It is not a backup; use Save Project for that.
  • 👁 View Current Data jumps to the main table so you can check what is entered.
  • + New Project clears the project details and all permits and requirements (it asks first).
  • Clear All removes all permits and requirements but keeps the project details (it asks first).
9

Choose the date format

Press 📅 Date format in the toolbar and choose how dates are shown and typed in every date box: DD/MM/YYYY, MM/DD/YYYY, YYYY-MM-DD, DD-MM-YYYY, DD.MM.YYYY or DD-Mon-YYYY. Type a date in that format, or click the 📅 in a date box to pick it from a calendar. A date that doesn't fit the format is outlined in red and not accepted.

The same format is used in the printout and in the generated report and its PDF. It changes only how dates look — your saved project and CSV files are not affected. Your choice is remembered in this browser for every tool on this site.

10

Explore the other tools

Press ☰ All Tools at the top of the page to see every engineering, project management and AI tool on this site, in the same order as the homepage. Type in the search box to find one quickly, then click it to open it. The tool you are using is marked you are here.

The Related tools links at the bottom of this page lead to tools that are often used together with this one.