Free contractor performance dashboard. Score schedule, cost, quality, safety, resources and contract compliance with an automatic rating.

Sample Project
Evaluate contractors against schedule, cost, quality, safety, resources and contractual performance, with an overall score and rating calculated automatically for each evaluation period.
by Shahid Pervaiz: pervaiz.shahid@gmail.com
Evaluations0
Avg Score—
Status Date—
Rev.A
Not saved to a file yet 📄 See Sample Report

Project Setup

Performance Summary

Contractor Evaluation Log

Score each criterion 0–100 · Overall Score and Rating are calculated automatically as the average of the six criteria
No. Contractor Name Evaluation Period Schedule Cost Quality Safety Resources Contractual Overall Score Rating Evaluated By Remarks
Method & practical use

Understand the result.

Free contractor performance dashboard. Score schedule, cost, quality, safety, resources and contract compliance with an automatic rating.

How to use this tool

  1. Enter the project details and reporting date; replace any sample records.
  2. Add or import your records, then review the summaries and outstanding actions.
  3. Save the project and use the available export or print controls to share the current report.

Units & method

Use the dates, quantities and currency shown in the workspace. Keep one currency and a consistent reporting cut-off.

Combine the entered performance criteria using the configured weights. A scorecard is an internal evaluation, not an independent certification.

Method: the owner’s supplied worksheet and the arithmetic described above.

Worked examples

Illustrative inputs for checking the method; these are not project records.

Worked scenario

Example: for two equally weighted criteria scored 80 and 60, the weighted score is 70. Document the evidence supporting each score.

Frequently asked questions

What does this tool calculate or track?

Free contractor performance dashboard. Score schedule, cost, quality, safety, resources and contract compliance with an automatic rating.

Which units and assumptions should I use?

Use the dates, quantities and currency shown in the workspace. Keep one currency and a consistent reporting cut-off. Combine the entered performance criteria using the configured weights. A scorecard is an internal evaluation, not an independent certification.

Can I save or share the result?

Use the save, export and print controls shown in this workspace. Where CSV export is available, the exported data can be opened in a spreadsheet. Browser print can save a PDF.

How to use the Contractor Performance Evaluation Dashboard

Everything runs in your browser — nothing is uploaded. If you are new to the tool, follow these steps in order.

1

See what the tool can do

Press Load Sample Data to fill the tool with five example evaluations of four firms (the main contractor, a signals subcontractor, a testing laboratory and a survey subconsultant). Then scroll down the page:

  • Project Setup — project name, client, status date and who prepared the evaluation.
  • Performance Summary — number of evaluations, average score and ratings.
  • Contractor Evaluation Log — one row per contractor per period, scored 0–100 on six criteria. The overall score and rating are calculated.

The first time you open the tool (when there is no data of yours in this browser) the sample is loaded for you, so you can see how it works straight away. Replace it with your own entries, press + New Project / Clear All to start empty, or load your saved project.

Load Sample Data replaces the data in the tool. Save your own work first.

2

See how the data file looks

Press ⬇ Export Table (.csv). It downloads the log as a CSV file that opens in Excel, with these 13 columns in this order:

ColumnWhat to enterExample
NoRow number1
Contractor NameCompanyABC Contracting LLC
Evaluation PeriodAny labelQ1 2026
Schedule, Cost, Quality, Safety, Resources, ContractualSix scores, each 0 to 10085
Overall ScoreWorked out by the tool; ignored on import—
RatingWorked out by the tool; ignored on import—
Evaluated ByWho scored itProject Manager
RemarksAny note
3

Enter your own data and import it

Replace the sample rows in the exported file with your own evaluations. Save it in Excel as CSV (Comma delimited). Then press ⬆ Import Table (.csv) and choose the file.

  • Columns are read by position, so keep the heading row and don't add, remove or reorder columns.
  • Scores outside 0–100 are brought back into range.
  • Import replaces all rows in the table. The project setup is kept.
4

Add, edit and delete rows

You can also work straight in the table on the page at any time, with or without a CSV:

  • + Add Evaluation adds a blank row. Click any cell to fill it in or change it.
  • The ✕ at the end of a row deletes that evaluation straight away. There is no undo, so save your project first.
5

Save your project and open it later

💾 Save Project (.json) saves the project setup and all evaluations in one .json project file. 📂 Load Project opens that file again, on any computer.

The note beside the Save button tells you whether you have unsaved changes or when you last saved. If you try to close or leave the page with unsaved changes, the browser asks you to confirm first (not needed when Autosave is ticked, because your work is kept in this browser).

Use the project file for backups and for sharing with colleagues. Don't edit it by hand.

6

Print, PDF and report

  • 🖶 Print / Save as PDF prints the page as you see it, in print-friendly colours. To get a PDF, choose Save as PDF as the printer in the print dialog.
  • 📄 Generate Report opens a formatted evaluation report in a new tab, with its own Print / Save as PDF button. If nothing opens, allow pop-ups for this site. To see a report the tool makes from its sample project (3 pages, PDF), press 📄 See Sample Report beside How to use.
7

Other buttons and options

  • Autosave in this browser (tick box) — while ticked, your work is kept automatically in this browser and comes back the next time you open the page. It stays only on this computer and browser. It is not a backup; use Save Project for that.
  • 👁 View Current Data jumps to the main table so you can check what is entered.
  • + New Project clears the project details and all evaluations (it asks first).
  • Clear All removes all evaluations but keeps the project details (it asks first).
8

Choose the date format

Press 📅 Date format in the toolbar and choose how dates are shown and typed in every date box: DD/MM/YYYY, MM/DD/YYYY, YYYY-MM-DD, DD-MM-YYYY, DD.MM.YYYY or DD-Mon-YYYY. Type a date in that format, or click the 📅 in a date box to pick it from a calendar. A date that doesn't fit the format is outlined in red and not accepted.

The same format is used in the printout and in the generated report and its PDF. It changes only how dates look — your saved project and CSV files are not affected. Your choice is remembered in this browser for every tool on this site.

9

Explore the other tools

Press ☰ All Tools at the top of the page to see every engineering, project management and AI tool on this site, in the same order as the homepage. Type in the search box to find one quickly, then click it to open it. The tool you are using is marked you are here.

The Related tools links at the bottom of this page lead to tools that are often used together with this one.

All Tools

← Homepage