Step 1: heavy vehicles and axle loads → heavy vehicle axle groups (HVAG) and their load spectrum over a 30–40 year design period. Step 2: subgrade CBR. Step 3: concrete, shoulders, reliability and sub-base. Step 4: six options — the Table 10-7 catalogue (dowelled and undowelled) and the slab thickness designed by fatigue and erosion for JUCP, JRCP and CRCP — compared by thickness and cost, then reinforcement, dowels, tie bars and joints.

Version: 2026-10-29 09:40Reference: Road Note 31, 5th edition (2023), Chapter 10 — thickness method from Austroads AGPT02Author: Shahid Pervaiz
👋 You are looking at sample data so you can see what this tool does. Change any value, or click New Project to start your own.

Project

Design traffic in heavy vehicle axle groups (Section 10.5.2)

Rigid pavements are designed for the number and load of each heavy vehicle axle group (HVAG), not for equivalent standard axles: concrete is sensitive to axle load magnitude (overloading) but much less to the number of repetitions (Section 10.5.2). Design period 30–40 years.

Design period, growth and design lane

Growth periodYearsGrowth rate (% a year)
Design period = sum of the years: 30–40 years for rigid pavements (Section 10.5.2, Key point 1 of Chapter 2).

Heavy vehicles and axle loads

One row per vehicle type and load state (laden and empty as two rows): daily number in each direction in the count year and the load on each axle group (Table 2-1 vehicle types, Pakistan truck types at the NHA limits, or your own). Every axle group of every vehicle becomes one load in the spectrum.

#Vehicle (Table 2-1) & descriptionDir. 1 per dayDir. 2 per dayAxle groups & loadsAxle groups / vehicleESA / vehicle (n = 4)ESA / day dir. 1ESA / day dir. 2
Legal axle load limits:

Use this when you know the total design traffic in HVAG but have no axle load survey. The load distribution is the example traffic load distribution of Austroads AGPT02 Appendix F (as used in its Appendix M worked example): 39.3% SAST, 0.9% TAST, 19.1% SADT, 25.9% TADT, 14.8% TRDT, each with a spread of loads. It is not from Road Note 31 and may not represent your road — use an axle load survey where possible.

Subgrade (Sections 3.3, 10.5.4.1)

Where the subgrade within 1 m below the sub-base is layered: CBRE = [Σ(hi CBRi0.333) / Σhi]3, layers top down to a depth of 1.0 m. Austroads conditions: combine layers thinner than 200 mm with a neighbour (using the lower CBR), stronger layers on top, no filter layers, maximum 15%.

Layer (top down)Thickness (m)CBR (%)

Concrete, shoulders, reliability & sub-base (Table 10-4 steps 2–6)

Concrete pavement options (Tables 10-4 and 10-7)

Costs (your rates, in place)

ItemRateUnit

Leave a rate blank if you don’t know it: options are then ranked by total thickness instead of cost.

Life-cycle cost (Chapter 12)

Pavement typePeriodic maintenance per kmEvery (years)
JUCP undowelled
Jointed unreinforced concrete pavement, no dowels at the joints
JUCP dowelled
Jointed unreinforced concrete pavement, dowels at the joints
JRCP
Jointed reinforced concrete pavement
CRCP
Continuously reinforced concrete pavement

Road Note 31 gives no maintenance quantities: enter your own estimates (0 is allowed). Every type needs an entry before the options are ranked by life-cycle cost.

Options for this traffic and subgrade

Pavement types: JUCP = jointed unreinforced concrete pavement (plain slabs, no steel mesh); JRCP = jointed reinforced concrete pavement (longer slabs with steel mesh); CRCP = continuously reinforced concrete pavement (no transverse joints, continuous longitudinal steel). Dowelled = steel dowel bars across the transverse joints transfer load between slabs; undowelled = no dowels, load passes by aggregate interlock.

Options to consider
Untick options that do not suit the project (traffic level, plant, ride quality, budget — Section 10.4). The ranking, life-cycle cost and report then cover only the ticked options; the others are listed as not considered.

Selected design

Reinforcement, dowels, tie bars & joints (Sections 10.5.5.2, 10.6)

Concrete pavement types (Table 10-1)

Method, assumptions & references

  • Traffic. Each axle group of each vehicle row is one load in the spectrum; repetitions = daily number in the design lane (Table 2-5 rule; for “heaviest direction” rules the direction with more axle groups) × seasonal factor × growth summed year by year (Equation 2-6). The MESA shown (for the Table 10-7 catalogue) uses the Table 10-2 standard loads with n = 4.
  • Thickness design (Table 10-4). Effective subgrade CBR from Figure 10-2 (straight lines read from the figure, maximum 75%; below CBR 2 use 150 mm LCS and 5%). Equivalent stress Se and erosion factor F3 from Equation 10-5 with the coefficients of Tables 10-8 to 10-10 (CRCP and JRCP use the dowelled erosion table). Fatigue: Equations 10-2 to 10-4 (unlimited below Sr = 0.45); erosion: Equation 10-6 (F2 = 0.94 with, 0.06 without concrete shoulder; unlimited when the bracket is zero). The thickness is the least multiple of 5 mm with total fatigue and erosion damage ≤ 100%, and not less than Table 10-6.
  • Verification. The engine reproduces the Austroads AGPT02-26 Appendix M worked example (40 million HVAG, CBRE 75%, 4.5 MPa, LSF 1.3, undowelled with shoulders): equivalent stresses and erosion factors of all five groups to 3 decimals, total fatigue 125% / erosion 119% at 210 mm and 66% / 93% at 215 mm, design thickness 215 mm.
  • Catalogue. Table 10-7 gives slab and sub-base by MESA and foundation class (F1–F4 from the subgrade class and the capping of RN31 Key 3).
  • Below the sub-base RN31 asks for at least 150 mm of unbound granular or selected subgrade material (Section 10.5.4.2); it is added to every option unless capping already provides it.
  • Steel. JRCP mesh and transverse / tie steel by subgrade drag (Equation 10-7, fs = 0.6 fsy, ρ = 2400 kg/m³); CRCP longitudinal steel by Equations 10-8 and 10-10 with the 0.67% minimum; cover Table 10-11; dowels Table 10-14 (450 mm long at 300 mm).
  • Costs. Construction quantities per km over the carriageway width at your rates; joint sealing, formwork and curing are not priced.
  • Not covered: RCC and CRCB thickness (RN31 gives none), steel fibre concrete, roundabouts (LSF + 0.3), mix design (Section 10.5.6).

Road Note 31 misprints found against the Austroads source

    • References: Road Note 31, 5th edition, TRL 2023 (FCDO / ReCAP), Chapter 10; Austroads AGPT02-26 Guide to Pavement Technology Part 2: Pavement Structural Design, Chapter 9 and Appendix M. Check every design against your road agency’s requirements.

    How to use the Road Note 31 Rigid Pavement Design tool

    The tool designs a concrete pavement to Road Note 31 Chapter 10: traffic in axle groups, subgrade, concrete and sub-base, then six options, the selected design with its damage tables, and its steel and joints. Everything runs in your browser; nothing is uploaded.

    1
    Start with the sample. The page opens with sample data so you can see what the tool does. Load Sample Data brings it back; New Project clears it. Hover over underlined words for explanations.
    2
    Step 1 — traffic. Either enter the vehicle mix (daily numbers in each direction and the load on each axle group, growth periods adding up to a 30–40 year design period) or, without a survey, the total HVAG with the Austroads example load distribution.
    3
    Step 2 — subgrade. CBR test results (10th percentile), a design CBR, or a layered subgrade by Equation 10-1.
    4
    Step 3 — design inputs. Concrete shoulder, flexural strength (4.5 MPa minimum), reliability (sets the load safety factor) and the sub-base, which sets the effective subgrade CBR. The tool checks the sub-base against Table 10-3.
    5
    Step 4 — options. Two catalogue options (Table 10-7, undowelled and dowelled) and four designed slabs (JUCP undowelled, JUCP dowelled, JRCP, CRCP). Type your rates to rank by cost; Use selects one.
    •
    Life-cycle cost and choosing an option (Chapter 12, Section 10.4). Set the analysis period, discount rate (about 6%) and, for each pavement type, your periodic maintenance cost per km and its interval (Road Note 31 gives no quantities; 0 is allowed). The options are then ranked by life-cycle cost in present value. The box Choosing between the options lists the Section 10.4.1 factors: budget and life-cycle cost, traffic level, ride quality, plant, new build or rehabilitation, labour and environment. Use Options to consider (or Designed slabs only / Catalogue only) to leave out options that do not suit the project; they are then listed as not considered.
    6
    Step 5 — selected design. Cross-section, quantities and cost, fatigue and erosion versus thickness, and the damage tables by axle group (the Table 10-4 calculation).
    7
    Step 6 — steel and joints. Friction, steel grade and bar sizes give the JRCP mesh, CRCP longitudinal and transverse steel, dowels, tie bars, cover and joint spacing.
    8
    Save, print, report. Save Project (.json) / Load Project; Export / Import Vehicles (.csv); Print / Save as PDF; Generate Report opens a full design report.

    Inputs are never uploaded. Check the design against Road Note 31, the Austroads guide and your road agency’s requirements.