Multiple Box Culvert Quantities Calculator

Review and total quantities and costs for a road-project culvert schedule.

Sample Road

Browse every culvert on one at a time — barrel, wing wall, apron slab, toe wall, loose riprap and mortared riprap quantities — priced against editable unit rates, plus a live project-wide total.

by Shahid Pervaiz: pervaiz.shahid@gmail.com

Unit Rates

Applied to every culvert in the portfolio and to the project total below. Edit to match your current schedule of rates.

Culvert Browser

Length runs along the waterway; span & height are the clear cell opening. Drag the slider or jump straight to a station.
Culvert 1 of 266

Quantity & Cost Summary

Barrel — geometry & quantities

Wing Wall (4 no., both ends)

Apron Slab (both ends)

Toe Wall (both ends)

Loose Riprap Class C & Mortared Riprap Class B (both ends)

Project Totals — All 266 Culverts

Recomputes live from the rates above.
Method & practical use

Understand the result.

Review and total quantities and costs for a road-project culvert schedule.

How to use this tool

  1. Select the geometry or design case and confirm the displayed units.
  2. Replace sample inputs with the project values, then calculate or review the live result.
  3. Check the method, assumptions and output; save or print the calculation with its input record.

Units & method

Dimensions m; volumes m³; steel t; unit rates in the selected currency.

Sum the geometric takeoffs for the loaded culverts, apply the matching unit rates and add contingency. The supplied project data is sample data. Verify each structure and specification; this tool does not design reinforcement or check hydraulic performance.

Method: the owner’s supplied worksheet and the arithmetic described above.

Worked examples

Illustrative inputs for checking the method; these are not project records.

Priced schedule, quantity factor 1

For nine sample quantity rows [10, 2, 3, 4, 5, 0.5, 6, 7, 8], each priced at 100 currency units per matching unit, the subtotal is 4,550.00. Adding 5% contingency gives 4,777.50. This checks pricing, not the source schedule geometry.

Priced schedule, quantity factor 2

For nine sample quantity rows [20, 4, 6, 8, 10, 1.0, 12, 14, 16], each priced at 100 currency units per matching unit, the subtotal is 9,100.00. Adding 5% contingency gives 9,555.00. This checks pricing, not the source schedule geometry.

Frequently asked questions

What does this tool calculate or track?

Review and total quantities and costs for a road-project culvert schedule.

Which units and assumptions should I use?

Dimensions m; volumes m³; steel t; unit rates in the selected currency. Sum the geometric takeoffs for the loaded culverts, apply the matching unit rates and add contingency. The supplied project data is sample data. Verify each structure and specification; this tool does not design reinforcement or check hydraulic performance.

Can I save or share the result?

Use the save, export and print controls shown in this workspace. Where CSV export is available, the exported data can be opened in a spreadsheet. Browser print can save a PDF.

How to use the All Box Culverts on a Road Project — Quantities Calculator

Everything runs in your browser — nothing is uploaded. If you are new to the tool, follow these steps in order.

1

Enter your inputs and read the results

The tool already holds every culvert on the project. Work down the page:

  • Project name and Unit Rates — rates for excavation, concrete, lean concrete, steel, riprap and filter, the contingency, decimal places and currency. Every total updates when you change a rate.
  • Culvert Browser — step through the culverts with ← and →, or type a culvert number and press Go. Each culvert shows its geometry, quantities and cost; Show detailed breakdown lists how each quantity is built up.
  • Project Totals — quantities and cost for all culverts together.
2

Export the quantities

  • Copy this culvert as CSV copies the culvert on screen for pasting into Excel.
  • Download full BOQ (CSV) downloads the bill of quantities for every culvert as one CSV file.
3

Explore the other tools

Press ☰ All Tools at the top of the page to see every engineering, project management and AI tool on this site, in the same order as the homepage. Type in the search box to find one quickly, then click it to open it. The tool you are using is marked you are here.

The Related tools links at the bottom of this page lead to tools that are often used together with this one.

All Tools

← Homepage